About the Project
Spanning over 250,000 m² of closed industrial space in Gaziantep, the Merinos MTR project adopted an integrated time and cost control framework powered by BIM. The multi-disciplinary planning, site monitoring, and document management workflows were coordinated through Autodesk Construction Cloud, establishing real-time field-to-office synchronicity and auditability.
Services Rendered Across Project
- 3D BIM Modeling
- Primavera P6 Scheduling & Time Controls
- ACC Docs & Build Electronic DCC Management
- Data-Driven PM Methodology
- Model-Based Field Integration
- 3D Physical Progress Monitoring
- Model-Linked Progress Billing & Reporting
- Tender & Contract Administration
- Steering Committee Coordination
Related Projects
SASA PTA PRODUCTION COMPLEX
375 Dönüm • Adana (Seyhan)
TEIAS SUBSTATION SWITCHYARD PERIMETER FENCING
Trafo Merkezleri Şalt Sahaları • Kozan – Erzin – Hatay
ASELSANNET OSMANİYE LARGE WAREHOUSE FACILITY
Kaba İnşaat İşleri • Osmaniye – Toprakkale
71 COLEBROOK ST RESIDENCE
Nitelikli Konut • Winchester, Birleşik Krallık
AKENERJI ERZIN COMBINED CYCLE POWER PLANT
600.000 m² / 900 MW • Hatay (Erzin)
Have a Similar Construction Project?
Let's plan your BIM and data management frameworks together.
Contact Us
STREAMLINE YOUR PROJECT
Manage Construction With Data Analytics, Not Guesswork
Get in touch with our engineering team for BIM coordination, budget controls, and site execution.