SASA PTA PRODUCTION COMPLEX
375 Dönüm • Adana (Seyhan) (2021)
About the Project
Covering 375 acres in Adana Seyhan, the SASA Purified Terephthalic Acid (PTA) complex leveraged advanced BIM infrastructure to bridge the gap between technical offices and real site execution. Physical progress, Primavera P6 schedules, and interim payments were updated in lockstep with the models.
Services Rendered Across Project
- 3D Parametric BIM Modeling
- Primavera P6 Scheduling & Phasing
- Autodesk BIM360 Common Data Environment
- Model-Based Field Progress Verification
- 3D Visual Status Tracking
- Automated Quantity Takeoff Valuation
- Contracts & Claims Administration
- Technical Drawing Shop Production
- Interdisciplinary Coordination
Related Projects
MERINOS MTR PROJECT
250.000 m² • Gaziantep
TEIAS SUBSTATION SWITCHYARD PERIMETER FENCING
Trafo Merkezleri Şalt Sahaları • Kozan – Erzin – Hatay
ASELSANNET OSMANİYE LARGE WAREHOUSE FACILITY
Kaba İnşaat İşleri • Osmaniye – Toprakkale
71 COLEBROOK ST RESIDENCE
Nitelikli Konut • Winchester, Birleşik Krallık
AKENERJI ERZIN COMBINED CYCLE POWER PLANT
600.000 m² / 900 MW • Hatay (Erzin)
Have a Similar Construction Project?
Let's plan your BIM and data management frameworks together.
Contact Us
STREAMLINE YOUR PROJECT
Manage Construction With Data Analytics, Not Guesswork
Get in touch with our engineering team for BIM coordination, budget controls, and site execution.