ASELSANNET OSMANİYE LARGE WAREHOUSE FACILITY
Kaba İnşaat İşleri • Osmaniye – Toprakkale (2026)
About the Project
Executed in 2026 in Osmaniye – Toprakkale for Kilic Group, this project covered the full structural concrete execution for the Large Warehouse Facility. Works include formwork and shoring systems, structural rebar placement, mass concrete pouring, and site logistical controls. Operations are synchronized with CPM schedules, quality assurance frameworks, and strict HSE protocols in accordance with technical specifications.
Services Rendered Across Project
- Formwork & Falsework Shoring Erection
- Reinforcing Steel Fabrication & Installation
- Structural Concrete Pouring & Curing Controls
- Site Supervision & Quality Assurance Auditing
- Material, Plant & Logistics Resource Planning
Related Projects
ISTANBUL REGNUM VILLA ESTATE
286 Konut – Villa & Ticari Yapılar • İstanbul
RONESANS ISTANBUL SANCAKTEPE CITY HOSPITAL
Şehir Hastanesi – Cephe Sistemleri • İstanbul (Sancaktepe)
MERINOS MTR PROJECT
250.000 m² • Gaziantep
SASA PTA PRODUCTION COMPLEX
375 Dönüm • Adana (Seyhan)
TEIAS SUBSTATION SWITCHYARD PERIMETER FENCING
Trafo Merkezleri Şalt Sahaları • Kozan – Erzin – Hatay
Have a Similar Construction Project?
Let's plan your BIM and data management frameworks together.
Contact Us