MAPPLE VALLEY LOGISTICS
Lojistik & Depolama Kompleksi • ABD (2022)
About the Project
Engineered to international operational codes in the USA, this facility implemented parametric BIM modeling to optimize equipment zoning, warehouse circulation, and material schedules.
Services Rendered Across Project
- Interior Architectural Modeling
- Equipment & Workplace Layout Scenarios
- Space Optimization & Traffic Circulation Studies
- Model-Driven Quantity & Material Audits
- Presentation Documentation & Revision Tracking Workflows
Related Projects
ISTANBUL REGNUM VILLA ESTATE
286 Konut – Villa & Ticari Yapılar • İstanbul
RONESANS ISTANBUL SANCAKTEPE CITY HOSPITAL
Şehir Hastanesi – Cephe Sistemleri • İstanbul (Sancaktepe)
MERINOS MTR PROJECT
250.000 m² • Gaziantep
SASA PTA PRODUCTION COMPLEX
375 Dönüm • Adana (Seyhan)
TEIAS SUBSTATION SWITCHYARD PERIMETER FENCING
Trafo Merkezleri Şalt Sahaları • Kozan – Erzin – Hatay
Have a Similar Construction Project?
Let's plan your BIM and data management frameworks together.
Contact Us