NORMAN PAPER CO. RETROFIT
Endüstriyel Üretim Tesisi • ABD (2018)
About the Project
Executed in 2018 across an active paper production facility in the USA, this industrial overhaul utilized digital twins to model structural and mechanical plant lines without operational downtime.
Services Rendered Across Project
- As-Built 3D Digital Twin
- Multiphased 3D BIM Modeling
- Interdisciplinary Renovation Coordination
- Model-Based Quantity Takeoff & BoQ Documentation
- Pre-Construction Model Review & 4D Simulation
Related Projects
MERINOS MTR PROJECT
250.000 m² • Gaziantep
SASA PTA PRODUCTION COMPLEX
375 Dönüm • Adana (Seyhan)
TEIAS SUBSTATION SWITCHYARD PERIMETER FENCING
Trafo Merkezleri Şalt Sahaları • Kozan – Erzin – Hatay
ASELSANNET OSMANİYE LARGE WAREHOUSE FACILITY
Kaba İnşaat İşleri • Osmaniye – Toprakkale
71 COLEBROOK ST RESIDENCE
Nitelikli Konut • Winchester, Birleşik Krallık
Have a Similar Construction Project?
Let's plan your BIM and data management frameworks together.
Contact Us
STREAMLINE YOUR PROJECT
Manage Construction With Data Analytics, Not Guesswork
Get in touch with our engineering team for BIM coordination, budget controls, and site execution.